Leachate Management

Project

Landfill Gas Interception Design and Installation

Location

Confidential

Year

2023

Services

Leachate Management, Supply and Installation

Project Solution

Core Environmental Projects (Core-EP) were engaged to design and replace existing leachate collection infrastructure following the issue of an EPA Improvement Notice to the site operator.

The purpose of the design, supply and installation services was to control current and future leachate levels at an active landfill site, where existing leachate management infrastructure had become non-operational due to ongoing settlement.

The leachate management infrastructure was successfully installed and reported by Core-EP, resulting in the EPA Improvement Notice being revoked.

More Projects

Landfill Gas Risk Assessment

View Case Study

arrow

Soil Vapour Mitigation

View Case Study

arrow

Soil Vapour Mitigation

View Case Study

arrow