Get In Touch
Reach Out To Our Team
Landfill Gas Interception Design and Installation
Confidential
2023
Leachate Management, Supply and Installation
Core Environmental Projects (Core-EP) were engaged to design and replace existing leachate collection infrastructure following the issue of an EPA Improvement Notice to the site operator.
The purpose of the design, supply and installation services was to control current and future leachate levels at an active landfill site, where existing leachate management infrastructure had become non-operational due to ongoing settlement.
The leachate management infrastructure was successfully installed and reported by Core-EP, resulting in the EPA Improvement Notice being revoked.
View Case Study
View Case Study
View Case Study