Get In Touch
Reach Out To Our Team
Landfill Gas Interception Design and Installation
West Gate Bridge, Victoria
2024
Asbestos Investigation and Management, Remediation Oversight, Air Monitoring, Regulatory Compliance Support Core-EP was engaged following the unexpected discovery of asbestos-containing material and illegally dumped waste during infrastructure works near the West Gate Bridge. The find had the potential to affect construction progress and the project program, and the team mobilised to site the same day.
Core-EP provided investigation, asbestos management, remediation oversight, air monitoring and regulatory compliance support throughout the works. A project-specific Soil and Asbestos Management Plan was developed to guide excavation, material handling, stockpile management and dust control, with detailed tracking used to ensure the safe segregation and disposal of impacted materials. Airborne fibre monitoring conducted throughout the works confirmed that control measures remained effective, and Core-EP subsequently completed validation and clearance assessments confirming the area was suitable for redevelopment. The rapid response and compliant site clearance allowed construction activities to proceed safely, with minimal disruption to the project program.


View Case Study
View Case Study
View Case Study