Passive Landfill Gas Interception

Project

Landfill Gas Interception Design and Installation

Location

Victoria

Year

2022

Services

Landfill Gas Collection Designer, Landfill Gas Collection Installer

Project Solution

Core Environmental Projects (Core-EP) prepared a Gas Interception Barrier (GIB) design for the boundary of a former basalt quarry, now closed landfill. The purpose of the system was to intercept the lateral migration of landfill gas towards neighbouring properties both in the long-term and short-term during redevelopment of the site, which included additional capping and surcharge.

Several design options with estimated costings were considered during the conceptual design, including biofiltration systems and cement-bentonite walls. Importantly, the system needed to be low maintenance, cost-effective and integrate with the final built form.

The final design utilised our in-house Computation Fluid Dynamic (CFD) modelling to optimise the design parameters including the gas collector bore diameters, spacings and depth while demonstrating acceptable gas capture efficiencies. We were subsequently engaged to install the second and third phase of the system, which included the fabrication and installation of the final gas venting system.

More Projects

Landfill Gas Risk Assessment

View Case Study

arrow

Soil Vapour Mitigation

View Case Study

arrow

Soil Vapour Mitigation

View Case Study

arrow