Environment

Engineering & Design

Remediation & Construction

Technical Consulting

03 9059 8083
Close

Leachate Management

Project

Landfill Gas Interception Design and Installation

Location

Queensland

Year

2025-2026 (Ongoing)

Services

Leachate Groundwater Treatment Plant (LGTP), design, commissioning and installation, operation, troubleshooting, maintenance, repair, treated water sampling, laboratory analysis, record keeping and compliance reporting.

Project Solution

Following capping and rehabilitation in 2022 of an engineered landfill containing paper mill waste, Core-EP was engaged to commission, operate, and maintain an on-site LGTP, treating leachate and groundwater to prescribed contamination limits prior to controlled release to land. Operating entirely above ground over a capped landfill cell, the LGTP processes extracted leachate through conical settling tanks, Advanced Filtration Material (AFM) vessels, and 21 multi-stage filter vessels, with treated water discharged via a controlled sprinkler irrigation system and verified through weekly laboratory testing.

More Projects

Landfill Gas Management

View Case Study

arrow

Leachate Management

View Case Study

arrow

Landfill Gas Risk Assessment

View Case Study

arrow