Landfill Gas Mitigation Design

Project

Landfill Gas Mitigation Design

Location

Melbourne, Victoria

Year

2018

Services

Landfill Gas Mitigation Design, Integrated Mitigation Design, Active Gas Mitigation Design

Project Solution

Core Environmental Projects (Core-EP) were engaged to complete a detailed landfill gas mitigation design for a large commercial warehouse development proposed adjacent to a former basalt quarry, now operating landfill.

The design was complicated by the proposed large-spanning slabs and the uncertainty brought by the adjacent operating landfill. Early in the design process Core-EP identified the potential for unacceptable mitigation performance if the gas protection system was to rely purely on a passive system (wind and stack effects). Accordingly, Core-EP utilised our multi-disciplinary team to design an active landfill gas ventilation system to effectively dilute landfill gas beneath the development.

More Projects

Closed Landfill Compliance

View Case Study

arrow

Detailed Site Investigation

View Case Study

arrow

Landfill Gas Management

View Case Study

arrow