Environment

Engineering & Design

Remediation & Construction

Technical Consulting

03 9059 8083
✕ Close

Landfill Closure Strategy

Project

Landfill Closure Strategy and Regulatory Optimisation

Location

Glenfield, NSW

Year

2025 – 2026 (Ongoing)

Services

Landfill Closure Strategy, Detailed Site Investigation, Landfill Gas Assessment, Regulatory Compliance Advice

Project Solution

As a landfill approaching closure, the site needed to demonstrate compliance with current EPA requirements across infrastructure built up over decades of evolving regulatory standards, including whether the existing capping system could be retained or would require costly reconstruction. Core-EP developed an integrated closure strategy combining detailed investigations, a review of historical data and assessment of more than 100 subsurface locations. The assessment demonstrated that large sections of the existing capping system remained fit for purpose and continued to satisfy current environmental performance objectives, allowing closure works to focus on targeted areas rather than site-wide remediation. Landfill gas management was also assessed through a staged gas extraction trial, generating site-specific data to evaluate recovery potential, long-term infrastructure requirements and risk to surrounding receptors. Drawing on environmental, engineering and construction expertise, Core-EP delivered a practical closure pathway addressing capping, landfill gas, leachate management, compliance and aftercare obligations. The risk-based closure strategy reduced remediation requirements, lowered anticipated closure costs and provided a clear, defensible pathway toward regulatory compliance and site closure.

More Projects

Closed Landfill Compliance

View Case Study

arrow

Detailed Site Investigation

View Case Study

arrow

Landfill Gas Management

View Case Study

arrow